SA2, the 3GPP working group that designs the core-network architecture, met in Calgary from 16 to 20 November 2026. The meeting had a deadline. In September the SA plenary asked SA2 to decide the overall 6G system architecture "as soon as possible and no later than SA2#178 (November 2026)" and to report the outcome to TSG SA#114 (SP-260999). Our preview described the compromise text that was on the table. This article records what SA2 actually did, based on the close-of-meeting draft report and the final revisions of the documents.
The official meeting record is not yet complete. This article is based on the Friday close-of-meeting draft report (v0.0.4), which was still the latest version on the 3GPP server on 23 November 2026, and on the document list with statuses updated on 23 November 2026. End-of-meeting chair's notes have not been published. The draft report may still change before SA2 approves it at a later meeting.
The short version: SA2 did not reach a decision on the overall 6G architecture, and it has told the SA plenary so in plain words. The reply says SA2 "has not yet reached consensus on the overall 6G System architecture as significant differences remain on several fundamental aspects", and asks SA#114 for further guidance (S2-2613124). Below that level the week was productive. SA2 settled NAS routing, wrote first principles for AI and intents into the study report, and answered RAN on dual registration: no consensus, and SA2 does not plan to study it further.
The overall architecture: reported to SA#114 without consensus
The rapporteurs' consolidated summary (NTT DOCOMO and Ericsson) went through three revisions: S2-2612551, S2-2612916 and S2-2612959. It was not agreed: the document list updated on 23 November marks it as postponed. During the discussion the SA2 chair reminded the room that the SA plenary had asked for agreement by the end of this meeting and that "there is only 1 further meeting to complete the work". The China Mobile-led consolidated proposal from 16 sources (revised to S2-2612931) was postponed as well. No other input in the overall-architecture section was concluded.
The approved reply to SA lists four outstanding issues, "not limited to":
- AI in essential connectivity. Whether and how AI NFs or AI Agent NFs may be involved, as an option, in procedures such as registration and PDU session establishment, with the final decision left to the respective core NFs. The reply adds that using AI NFs for these procedures "is not mandatory".
- UE intent delivery. Control plane (NAS), user plane or both, and whether intents may be piggybacked on existing mobility and session management messages.
- Organization of AI functions. One dedicated NF for intent handling and fulfilment or several, and with which standardized interfaces. Even the term "AI NF / AI Agent NF" is for further study (FFS).
- EPS-to-6G interworking. No consensus on idle-mode mobility from 4G to 6G with IP address preservation.
The reply also notes one overall point that is agreed: the xAMF and xUPF in the 6G core are the control-plane and user-plane entry points from the 6G RAN. It says the indicative show-of-hands polls "have not been used to establish working assumption or working agreement". It also recalls that the study (FS_6G_ARC) is scheduled to finish in March 2027.
Our reading. The SA plenary's guidance said that SA#114 "will discuss and decide any required next steps". The choice now sits with the plenary in Boston, not with SA2. The last, postponed revision of the rapporteurs' text shows how far the convergence got. It proposes a 6G core of standardized NFs, connectivity procedures specified "without relying on the deployment or availability of AI functionality/AI agent(s)", and final decisions staying with the xAMF, xSMF and xPCF. It also lists more than a dozen explicit open issues on intents and AI agents. Because the text was not agreed, none of this is binding.
NAS routing: settled in the xAMF
The NAS routing question from the preview was decided under its own key issue (KI#1.1). SA2 approved an interim conclusion with 41 listed sources (S2-2613048). The sources include Nokia, Huawei, T-Mobile USA, AT&T, China Mobile, Samsung, Deutsche Telekom, Qualcomm, Apple and Google. NTT DOCOMO, Ericsson and Vodafone are not among them. The agreed principles:
- One NAS protocol stack for all 6G UEs, one control-plane entry point from the 6G RAN to the core, and one serving xAMF per UE that handles registration, mobility and primary authentication.
- NAS routing/transport is supported in the xAMF but is "separated from NAS MM (unlike NAS Transport in 5G)". Session management and other operator-service signalling are routed to their NFs using routing information carried outside the NAS payload.
- Security terminates at the xAMF with a single security context, an assumption still to be confirmed by SA3. Encoding and stage 3 design are left to CT1.
A broader KI#1.1 conclusion was block-approved alongside it (S2-2613085). The Vodafone, NTT DOCOMO and AT&T paper that argued for keeping NAS as in 5G was not concluded.
AI and intents: first principles, structure still open
For the AI key issue (KI#18), SA2 approved a first set of interim principles (S2-2613128):
- "AI capabilities and technologies are optional, and subject to operator policies and configuration". The 6G architecture including AI "shall be multi-vendor interoperable, reliable and sustainable".
- The 6G core accepts 3GPP intents only from UEs and AFs. The UE modem (MT) does not need to produce or understand intents.
- NF capabilities that intent-handling functions can use "should be fully standardized", including inputs, outputs and procedures. Intents from untrusted AFs pass through an exposure function.
- Still FFS: how many new NFs handle intents, piggybacking intents on NAS, the use of control plane versus user plane, and roaming.
The informal polls show where companies stand on transport. Asked which mechanism should carry intent-based requests from the UE, 19 companies said control plane only (27 against), 24 said user plane only (28 against), and 38 supported both, with the choice between them left FFS (12 against). These counts come from the rapporteurs' show-of-hands document as recorded in the draft report. They are not 3GPP decisions.
Two inputs from the preview got no outcome. The information-assurance agencies' paper (NCSC, BSI, NSA and NPL) asking SA2 to endorse that core NFs can be "isolated from agents, and to operate in their absence" (S2-2611681) is recorded as not concluded, with no discussion recorded. The same holds for the 18-source operator principle that essential connectivity should not depend on AI (S2-2612277). A draft reply to SA3 on Secure by Design principles was noted because no agreement on the text was reached.
Dual registration: no consensus, not pursued further
The RAN plenary had asked SA2 whether a 6G phone could keep 5G voice (VoNR) on a 5G registration and 6G data on a 6G registration, with no RAN impact (RP-262264). On the operators' solution proposal (S2-2612554), the chair asked for an informal indication: 6 in support, 16 not supporting, 16 objecting. Among the objections recorded in the report, T-Mobile USA said the solution needs a RAN broadcast indicator, which conflicts with the "no RAN impact" condition. Apple and Google cited power consumption and dual-radio complexity, and Qualcomm and Nokia said that no complete, working solution had been presented. The proposal was noted.
The approved reply to TSG RAN, TSG SA and RAN1–RAN4 is two sentences long: SA2 "did not reach consensus on the solutions to support the Dual Registration scenario" (S2-2613043). According to the draft report, SA2 does not intend to study the scenario further in FS_6G_ARC. That wording was kept out of the LS itself. Separately, SA2 approved principles for 6G–4G interworking (S2-2613127). Single registration is the baseline, idle and connected mobility from 6G to EPS are supported, and the move from EPS to 6G is FFS.
Also agreed in the 6G study
- AI agents on phones (KI#19). An updated interim agreement on UE AI agent registration, discovery and communication was approved (S2-2612866). In the poll, 42 companies supported realizing it with new 6G NF(s), with 6 against. An LS to SA3 (S2-2613121) asks for feedback on the working assumptions: only operator-controlled UE AI agents and only one per UE in this release, with the agent ID allocated by the home network and held in the subscription.
- Data framework (KI#21). SA2 approved interim agreements on data registration and discovery, exposure, processing, and storage and retrieval (S2-2613110, S2-2613111, S2-2612971, S2-2613112). The overall structure is not decided. In the poll, 30 supported three NF types (Alt B2, 17 against) and 21 a single NF type (Alt A1, 24 against). A reply to RAN2 (S2-2613119) asks for a decision "latest in Q1 2027" on whether the core network or OAM collects data for UE-side model training.
- Terrestrial–satellite continuity (KI#23). The merged Ericsson-led text was approved (S2-2613051). With a roaming or sharing agreement, one subscription covers both networks. Without one, a UE with two USIMs can reach the overlay network through the satellite network, with QoS mapped by DSCP values if the operators agree on it. Interim agreements on multi-orbit access (S2-2613052) and NTN deployment modes (S2-2612770) were also approved, plus an LS to RAN on dependencies (S2-2613053).
- QoS (KI#5). In the poll, 43 companies supported reusing the 5G GBR and non-GBR concepts, with 1 against (Ericsson).
What happens next
- SA#114, Boston, 8–11 December 2026. The plenary receives the SA2 status report and decides on next steps for the overall architecture.
- SA2#178-AH-e, online, 25–29 January 2027. A subset of 6G key issues. Under the rapporteurs' planning slides, which were postponed rather than endorsed (S2-2613117), the subset includes slicing, user plane, QoS, voice, sensing and computing. The slides warn that an e-meeting "is likely not a good opportunity to reach agreements on very controversial topics".
- SA2#179, Incheon, 22–26 February 2027. The rapporteurs plan to start moving interim agreements from clause 7 into the study's conclusions (clause 9). It is the last SA2 meeting before the study's scheduled completion in March 2027. SA2#180 follows in Stockholm on 19–23 April 2027.
The radio groups met in the same week. RAN2 asked SA2 to take into account that 6G needs a separate RRC inactive state (our RAN2#136 summary), and RAN1's decisions on the 6G radio are in our RAN1#127 summary.
Sources
SA2#178 draft meeting report v0.0.4 ("Friday close of meeting draft") and the document list by agenda item with statuses (report from 20 November, document list updated on 23 November 2026). The texts are quoted from the final revisions linked above, read with tracked deletions removed. Show-of-hands counts are informal polls from the rapporteurs' documents (S2-2612914 to S2-2612982) as recorded in the report. They are not 3GPP decisions. Meeting dates are from the 3GPP meeting calendar. The meeting report stays a draft until SA2 approves it at a later meeting. End-of-meeting chair's notes were not on the 3GPP server as of 24 November 2026.
